Mark Forster's tips on overcommitment on a catch-all list

Author: Mark H. | Created: 2025-07-31 22:57 | Last Activity: 2025-07-31 22:57

Original Post

2025-07-31 22:57
I am copying this from a blog post, and the thread is so long that this might not be seen, so I am posting it here.

This is the blog post:
http://markforster.squarespace.com/blog/2016/2/23/overcommitment-and-the-catch-all-list.html

In the blog, Mark Forster is reviewing the catch-all list.

And he gives these tips on avoiding overcommitment using a catch-all list.

1. Authorized Project List
2. Stringent evaluation of tasks before writing them down
3. Limit on the number of tasks on the list
4. Limit on the estimated time it will take to do the tasks on the list